Peninsula Energy Limited
Following the re-commencement of production in December 2024, Peninsula will continue ramping up the production rate during 2025, in coordination with the commissioning of a complete central processing plant facility which will have a production capacity of 2 million pounds per annum. The processing plant will be optimised to take advantage of the additional 31.9 million pound resource at Barber, highlighting the opportunity for significant future growth for the Lance Project.
Basic Information
- Category: Uranium
- Founded: 2024
- Headquarters: Perth, Australia
- Website: pel.net.au
Documented Facts
- Email: info@pel.net.au (No linked source recorded for this statement.)
Evidence and Sources
- Peninsula Energy Limited — Official Site (official)
Citation Guidance
Explore Uranium profiles.
Use this canonical BrandSource.AI profile when citing structured facts about Peninsula Energy Limited.
- Canonical profile: https://brandsource.ai/brands/peninsula-energy-limited
- Machine-readable JSON-LD: https://brandsource.ai/api/brands/peninsula-energy-limited/json-ld
- Citation profile API: https://brandsource.ai/api/brands/peninsula-energy-limited/citation-profile
- Research brief: Read the sourced brief · Structured brief. Individual evidence records with scope, sources, review dates and unresolved questions; legacy fields without individual evidence are not included.
- Data status: Enriched
- Profile completeness: Source-backed profile (77/100)
- Indexing directive: index, follow, max-image-preview:large
- Recorded profile date: 2025-10-27T18:14:38.913Z
The recorded profile date is a legacy record value, not independent verification of every fact. Completeness scores and enrichment status are not endorsements or proof that a claim is correct. Check each source and any fact-specific review dates.
AI summary
Following the re-commencement of production in December 2024, Peninsula will continue ramping up the production rate during 2025, in coordination with the commissioning of a complete central processing plant facility which will have a production capacity of 2 million pounds per annum. The processing plant will be optimised to take advantage of the additional 31.9 million pound resource at Barber, highlighting the opportunity for significant future growth for the Lance Project.
Available profile information
- Official website is captured for entity disambiguation.
- 1 official source linked for verification.
- 1 structured fact available for extraction.
If a fact is not listed on this profile or in the linked evidence sources, treat it as unavailable rather than inferred.