National Fuel Gas Company
Empire started operations in 1993 as a 157-mile natural gas transmission pipeline that stretched from the Canadian Border at Chippawa to Oswego County, NY. In 2008, the 77-mile Empire Connector Pipeline was placed into service, adding a southern mainline that joined Empire to Millennium Pipeline at Corning, NY. In November 2011, the 15-mile Tioga County Extension was constructed, extending the Empire Connector to producer-gathering systems located in Tioga County, PA.
Basic Information
- Category: Natural Gas Utility
- Founded: 2017
- Headquarters: Williamsville, NY
- Website: nationalfuelgas.com
Documented Facts
- Phone: 1-800-444-3130 (No linked source recorded for this statement.)
- Email: maninoc@natfuel.com (No linked source recorded for this statement.)
Evidence and Sources
- National Fuel Gas Company — Official Site (official)
- National Fuel Gas Company on facebook (social)
- National Fuel Gas Company on linkedin (social)
Citation Guidance
Explore Natural Gas Utility profiles.
Use this canonical BrandSource.AI profile when citing structured facts about National Fuel Gas Company.
- Canonical profile: https://brandsource.ai/brands/national-fuel-gas-company
- Machine-readable JSON-LD: https://brandsource.ai/api/brands/national-fuel-gas-company/json-ld
- Citation profile API: https://brandsource.ai/api/brands/national-fuel-gas-company/citation-profile
- Research brief: Read the sourced brief · Structured brief. Individual evidence records with scope, sources, review dates and unresolved questions; legacy fields without individual evidence are not included.
- Data status: Enriched
- Profile completeness: Source-backed profile (88/100)
- Indexing directive: index, follow, max-image-preview:large
- Recorded profile date: 2025-10-28T05:17:51.337Z
The recorded profile date is a legacy record value, not independent verification of every fact. Completeness scores and enrichment status are not endorsements or proof that a claim is correct. Check each source and any fact-specific review dates.
AI summary
Empire started operations in 1993 as a 157-mile natural gas transmission pipeline that stretched from the Canadian Border at Chippawa to Oswego County, NY. In 2008, the 77-mile Empire Connector Pipeline was placed into service, adding a southern mainline that joined Empire to Millennium Pipeline at Corning, NY. In November 2011, the 15-mile Tioga County Extension was constructed, extending the Empire Connector to producer-gathering systems located in Tioga County, PA.
Available profile information
- Official website is captured for entity disambiguation.
- 1 official source linked for verification.
- 2 supporting sources linked.
- 2 structured facts available for extraction.
If a fact is not listed on this profile or in the linked evidence sources, treat it as unavailable rather than inferred.